ERP RFP Template (Free): Software and Implementation
Paste-ready ERP requirements (finance, procurement, inventory, order to cash, manufacturing, distribution), implementation partner terms, vendor questions and a weighted scoring rubric.
Paste-ready CMMS requirements (work orders, preventive maintenance, offline mobile, assets, MRO inventory, purchasing), vendor questions that separate products, and a weighted scoring rubric.

See the structure before you download. The Word file has every section listed below, ready to fill in.
The sections in the document, in order.
Use this CMMS RFP template when you're choosing maintenance software to replace paper, spreadsheets or an older computerized maintenance management system for a plant, a facilities portfolio or a fleet of equipment.
It's written for the maintenance, facilities, IT and procurement team running the selection, and it covers the whole process: the requirements to send, the questions that separate vendors, how to score the answers, and when to choose an EAM RFP instead.
Download the editable Microsoft Word version below. Every requirement, vendor question and scoring weight on this page is in the document, ready to tailor and send.
A CMMS only pays off if planners and technicians use it every day, so involve them from the start and test the mobile app where the work actually happens. The example schedule below runs about 11 weeks from kickoff to contract award; stretch it if you have many sites or need to clean up asset data before vendors can demo with it.
A CMMS RFP fits when the goal is to run maintenance well: requests, work orders, preventive maintenance, spare parts, purchasing and technician mobility, across one site or many. Enterprise asset management (EAM) software covers the same ground and extends it across the whole asset lifecycle, from investment planning to disposal.
If your requirements stop at the maintenance and facilities teams, this template is the right starting point. If you find yourself adding items like the ones below, start from the EAM RFP template on RFPhub instead, or run an RFI that lets vendors propose either.
Signs you need an EAM RFP rather than a CMMS RFP:
Each line is written to paste straight into your RFP. Must-have means a vendor that cannot meet it is out; Nice-to-have earns extra points. Change the priorities to fit your situation, and delete what doesn't apply.
| ID | Requirement | Priority |
|---|---|---|
| F1 | Work requests from any employee or building occupant through a web portal, mobile app, email or a QR code on the asset or location, with status updates sent to the requester. State whether requesters need a paid license. | Must-have |
| F2 | A configurable work order workflow from request through approval, planning, scheduling, assignment, completion and supervisor review, with approval rules by work type, cost, site or asset criticality. | Must-have |
| F3 | Work order completion that records labor hours, parts used, readings, photos, notes, downtime and failure codes (problem, cause and remedy), with costs rolled up to the asset, location and cost center. | Must-have |
| F4 | A planning and scheduling view of the backlog by craft, technician, shift and date, showing skills, certifications and availability, with drag-and-drop assignment and rescheduling. | Must-have |
| F5 | Time-based preventive maintenance on fixed schedules (due on set dates) and floating schedules (next due date set from the last completion), with work orders generated a set number of days before they are due. | Must-have |
| F6 | Meter-based preventive maintenance triggered by runtime hours, cycles, distance or other counters, including 'whichever comes first' combinations of time and meter triggers. | Must-have |
| F7 | Condition-based maintenance: alerts or follow-up work orders created automatically when a recorded reading, such as temperature, vibration or pressure, falls outside set limits. | Must-have |
| F8 | Reusable job plans for preventive and corrective work, with task steps, estimated labor by craft, required parts and tools, and safety precautions, that can be applied to many assets at once. | Must-have |
| F9 | A preventive maintenance forecast showing upcoming PM workload by period, site and craft, and PM compliance reporting that shows work completed on time, late or missed. | Must-have |
| F10 | Digital inspection checklists on work orders (pass/fail, readings, photos and signatures), with a follow-up work order created when a check fails. State whether inspection rounds covering many assets can run as one route. | Must-have |
| F11 | An asset hierarchy (site, building or area, system, asset, component) with parent-child relationships, and a full history of work, costs, readings and downtime for every asset that stays intact when a component is moved or replaced. | Must-have |
| F12 | Asset records with nameplate data, criticality ranking, documents (manuals, drawings and certificates), warranty terms and custom fields, plus barcode or QR tags that open the record from a phone. Alert technicians when a work order is raised on an asset under warranty. | Must-have |
| F13 | Spare parts and MRO inventory across multiple storerooms and bins: min/max levels and reorder points, part reservations for planned work, issues and returns against work orders, cycle counts, and a spare parts list for each asset. | Must-have |
| F14 | Maintenance purchasing: requisitions raised from work orders or reorder points, approval routing, purchase orders and receiving, with costs posted to the work order and asset. If purchasing runs in our ERP instead, describe how the two systems share the process. | Must-have |
| F15 | Vendor and contractor management: vendor records, service contracts with terms and renewal dates, contractor work orders with completion evidence, and tracking of contractor insurance certificates and qualifications with expiry alerts. | Must-have |
| F16 | Safety procedures, such as lockout/tagout steps, isolation points and required protective equipment, attached to job plans and work orders, with technician acknowledgment on mobile before work starts. | Must-have |
| F17 | Dashboards and standard reports that the system calculates from work order and downtime data, including mean time between failures (MTBF), mean time to repair (MTTR), PM compliance, backlog by craft, planned versus reactive work, and maintenance cost by asset, site and cost center. State how each metric is calculated, and provide a report builder our administrators can use without vendor services. | Must-have |
| F18 | Multi-site operation in one system, with site-level security, shared or site-specific parts catalogs and job plans, visibility of stock held at other sites, and reporting across all sites. State the languages, currencies and units of measure supported. | Must-have |
| F19 | AI assistance, such as drafting job plans from equipment manuals, summarizing an asset's work history, or turning technician voice notes into work order text, with a person reviewing the output before it is saved. State which features are generally available today. | Nice-to-have |
| ID | Requirement | Priority |
|---|---|---|
| T1 | Cloud (SaaS) delivery hosted in [region]. State the hosting provider, the regions available, whether the service is multi-tenant, and whether an on-premises or private-cloud option exists. | Must-have |
| T2 | Native mobile apps for iOS and Android that work fully offline: view and complete assigned work orders, create requests, record readings, issue parts and add photos without a connection, then sync automatically when it returns. State how much data is cached on the device and how conflicting edits are resolved. | Must-have |
| T3 | Barcode and QR code scanning with the phone camera to open assets, locations, work orders and parts. State support for NFC tags and rugged handheld scanners. | Must-have |
| T4 | Configuration without custom code: custom fields, forms, picklists, workflows, roles and notifications, kept intact through upgrades. | Must-have |
| T5 | Performance at our scale: [number] assets, [number] work orders a year and [number] concurrent users across [number] sites. Describe your largest comparable deployment. | Must-have |
| T6 | Bulk import tools for assets, locations, PM schedules, parts and work order history from spreadsheets or another CMMS, with validation and error reports. | Must-have |
| T7 | A separate sandbox environment for testing configuration, integrations and new releases before they reach production. | Nice-to-have |
| ID | Requirement | Priority |
|---|---|---|
| I1 | Single sign-on with our identity provider via SAML 2.0 or OIDC, and user provisioning via SCIM. State how technicians sign in on shared devices. | Must-have |
| I2 | Integration with our ERP for cost centers and general ledger codes, vendors, purchase orders and receipts, part costs and fixed-asset records. State whether each connector is prebuilt, partner-built or custom, and who maintains it. | Must-have |
| I3 | A documented REST API with read and write access to assets, work orders, PM schedules, parts and meter readings, plus webhooks or event notifications. State any rate limits or extra charges. | Must-have |
| I4 | Condition-monitoring and IoT integration: sensor readings received through the API, an IoT platform, or industrial protocols such as MQTT or OPC UA, used to update meters and to create alerts or work orders when limits are crossed. | Nice-to-have |
| I5 | Alarms from building automation (BAS/BMS) or SCADA systems, and runtime readings from plant historians, turned into work orders or meter updates. | Nice-to-have |
| I6 | A connection for our business intelligence tool, such as OData, ODBC or a scheduled export to our data warehouse, covering all maintenance data. | Nice-to-have |
| ID | Requirement | Priority |
|---|---|---|
| S1 | A current SOC 2 Type II report or ISO/IEC 27001 certification covering the proposed service, available under NDA. | Must-have |
| S2 | Role-based permissions by role, site and type of data (for example, hiding labor rates and costs from technicians), with administrator access through SSO and MFA. | Must-have |
| S3 | Encryption in transit and at rest, isolation of our data from other customers, and documented backup and restore. State backup frequency and your recovery point and recovery time objectives. | Must-have |
| S4 | An audit trail that records who changed what and when, with before and after values, for work orders, assets, PM schedules and inventory transactions. Users cannot edit or delete audit records. | Must-have |
| S5 | Schedules and audit-ready records for statutory and regulatory inspections (for example, fire protection systems, elevators and pressure vessels), with completion history by asset that we can give to auditors, insurers and inspectors. | Must-have |
| S6 | Electronic records and signatures that meet FDA 21 CFR Part 11 and EU GMP Annex 11, including signature meaning and reason-for-change prompts, with validation documentation for each release. Make this Must-have if you operate GMP-regulated sites. | Nice-to-have |
| S7 | Calibration management for instruments and test equipment: calibration schedules, as-found and as-left readings, tolerance checks, and follow-up when an instrument is out of tolerance. | Nice-to-have |
| S8 | A data processing agreement, a current list of sub-processors, data storage in [region], and a contractual commitment to notify us of security incidents affecting our data within a defined time. State the time. | Must-have |
| ID | Requirement | Priority |
|---|---|---|
| M1 | A phased implementation plan with named roles and the effort expected from our team, identifying who delivers the work (vendor, partner or both) and the named team's relevant experience. | Must-have |
| M2 | Migration of our asset register, PM schedules, parts catalog, open work orders and [number] years of work history from [current system], stating which cleanup and mapping tasks fall to us. | Must-have |
| M3 | Role-based training for administrators, planners, technicians, storeroom staff and requesters, with train-the-trainer materials and in-app help. | Must-have |
| M4 | A service-level agreement for availability, with service credits. State the commitment and how availability is measured. | Must-have |
| M5 | Support hours and response-time targets by severity, including out-of-hours support for issues that stop technicians working. State your targets. | Must-have |
| M6 | Release notes and advance notice of changes that affect workflows or the mobile app, plus a public status page. | Must-have |
| M7 | Optional services to help build our PM program and asset criticality ranking from manufacturer recommendations and our failure history. | Nice-to-have |
| ID | Requirement | Priority |
|---|---|---|
| C1 | Pricing by user type (for example, administrator, planner, technician, requester, contractor and read-only), module and term, showing list price, discount and net price. State which user types are free. | Must-have |
| C2 | Prices for adding users, sites or modules mid-term, co-terminated with the main agreement. | Must-have |
| C3 | A cap on price increases at renewal. State the cap. | Must-have |
| C4 | An itemized list of any charges for API access, integrations, data storage, sandbox environments or premium support. | Must-have |
| C5 | Pricing that ramps with the site rollout, so we don't pay for every site before it goes live. | Nice-to-have |
| C6 | A technician pilot at no charge, or a paid pilot credited against the first year's fees. | Nice-to-have |
| C7 | Exit terms covering export of all data, including attachments and history, in a usable format, and transition assistance at the end of the contract. | Must-have |
These questions are designed to separate vendors, not to collect brochure answers. Ask for evidence: a demo, a document or a reference.
Score each criterion from 1 to 5, multiply by its weight, and add the results. The weights below are a starting point; agree on your own before any proposals arrive so the scoring can't be bent around a favorite.
| Criterion | Weight | What a strong response shows |
|---|---|---|
| Work orders and preventive maintenance | 20% | Every Must-have met in a generally available release and shown with your data: request to close, time, meter and condition triggers, and reusable job plans. |
| Mobile app and offline use | 15% | Technicians in the pilot complete real work orders offline, scan assets and sync without lost or duplicated data. |
| Assets, MRO inventory and purchasing | 15% | A clear asset hierarchy with history that survives moves and replacements, and a parts flow from reservation to receipt with costs landing on the asset. |
| Reporting and maintenance metrics | 10% | Documented definitions for MTBF, MTTR, PM compliance and backlog, and reports your administrators can build without vendor help. |
| Integration and data access | 10% | ERP and SSO integrations in production with similar customers, an open API, and a credible path for sensor or building-system data if you need it. |
| Security, compliance and audit trail | 10% | Current SOC 2 or ISO 27001 evidence, granular roles, a complete audit trail, and Part 11 support with validation documents if you run GMP-regulated sites. |
| Implementation, data migration and support | 10% | A realistic plan for cleaning and migrating your data, an experienced named team, and clear SLAs and support targets. |
| Commercials and total cost | 10% | Transparent pricing by user type, affordable requester and contractor access, a renewal cap and fair exit terms over a three-year view. |
| Total | 100% |
Scoring scale
Your scope and the numbers vendors price against (sites, assets, users by type and work order volume); requirements for work orders, preventive maintenance, mobile and offline use, assets, spare parts, purchasing, contractors, reporting and integration, each marked Must-have or Nice-to-have; security and compliance terms; support and SLA terms; a pricing table broken down by user type; and the rubric you'll score with. This template includes all of them.
The example schedule in this template runs about 11 weeks from kickoff to contract award, including three weeks for vendor responses and three to four weeks for scripted demos and a technician pilot. Allow more time if you have many sites, need validation for GMP-regulated sites, or must clean up your asset register before vendors can demo with your data.
Ask questions that need a demonstration rather than a yes: completing a work order offline and syncing it, setting up a PM that triggers on a date or a meter reading, how MTBF and MTTR are calculated, and what requester and contractor users cost. Also ask which AI features are available today and which are still on the roadmap. The vendor questions on this page work with any CMMS vendor.
Common models are a subscription per named user, often with lower prices or no charge for limited user types such as requesters and read-only users, or pricing by site, asset count or module. Integrations, API access and sandbox environments may be charged separately. Ask for pricing by user type and module, a renewal cap and the cost of adding sites, so you can compare a three-year total.
Paste-ready ERP requirements (finance, procurement, inventory, order to cash, manufacturing, distribution), implementation partner terms, vendor questions and a weighted scoring rubric.
Seeks a robust Capital Project Management Software solution that integrates advanced project portfolio management, financial controls, and AI capabilities.
Paste-ready EAM requirements (asset hierarchies, linear assets, work management, RCM, capital planning, MRO inventory, GIS and IoT), sharp vendor questions and a…